ALLAN SHEUNG, Msc. (Project Management)
Allan Sheung is a Senior Professional Cost Estimator with over 19 years of demonstrated leadership in all aspects of project management and cost estimating related to a wide range of Heavy and Light Railway, Transit, Utilities, Heavy Civil, Residential, Industrial, Commercial and Institutional projects. Proven track record of reducing the costs of the projects and enhancing value for money, whilst facilitating effective advice to clients. Possesses a combination of Budgeting, Cost Estimating, Cost Control, Contracting, Procurement, and Team Management expertise. Demonstrates ability to catalyze lucrative results while complying with budget, resources and time constraints. Added value to major organizations by forecasting multi-billion dollar budgets, optimizing cost and return on investment through successful planning. Establishes excellent interpersonal and communication skills in cultivating professional relationships with municipalities, consultants, contractors, clients, and stakeholders alike. His project portfolio below highlights projects he was involved with while working for Metrolinx, Ontario Power Generation, Kenaidan Contracting, First Gulf Corporation, Tridel Corporation, CH2M HILL and other EPC and consulting firms. Expert level cost estimator across the following disciplines; Heavy Civil, Structural, Architectural, Mechanical HVAC, Plumbing, Process Piping, Mechanical Equipment, Building Electrical, Rail Signalling, Process Instrumentation & Controls.
Mr. Sheung is currently pursuing a Msc. Degree in Project Management – Construction &
Infrastructure from the University of Liverpool. Software Proficiency: MS Office, Suretrack & MS
Project, Sage Timberline, Ecosys, Primavera Contract Management (CM14), Oracle, Asset Suite/Passport, InEight (HardDollar), US Cost. Primavera, Proliance, RIB U.S. Cost, Bid2Win, WinEst, HeavyBid, Autodesk Quantity Takeoff, Maxwell Earthwork, Autodesk AutoCAD & Revit.
PROJECT PORTFOLIO
TRANSPORTATION
Metrolinx Eglinton Crosstown Light Rail Transit, Toronto, Ontario; 2010 – 2011, 2013, 2017.
Senior Estimator and Cost Control Specialist, Prepared PPP Staff Resources, Design and
Construction Cost Estimates and Variance Analysis for different scopes, e.g. 15 Underground
Stations, Above-ground Stops, Tunnel, Civil, Bridge, Track, Signal, Traction Power and Systems, $6
Billion.
Metrolinx Finch Light Rail Transit, Toronto, Ontario; 2017. Senior Estimator, Prepared PPP Staff
Resources, Design and Construction Cost Estimates in different scopes, e.g. 2 Underground
Stations, Above-ground Stops, Civil, Bridge, Track, Signal, Traction Power and System, $1.5 Billion.
Metrolinx Hamilton Light Rail Transit, Hamilton, Ontario; 2017. Senior Estimator, Prepared PPP
Staff Resources, Design and Construction Cost Estimates in different scopes, e.g. 2 Underground
Stations, Above-ground Stops, Civil, Bridge, Track, Signal, Traction Power and System, $1 Billion.
York Region Transit Bus Rapidway Hwy 400 Ramp and Bridge Realignment, Toronto, Ontario;
2017. Senior Estimator, Consolidate Construction Cost Estimates, Variance Analysis and Quantity
Surveying, $330 Million.
Ministry of Transportation Ontario, Highway 401, London, Ontario; 2017. Senior Estimator,
Prepared Design Build Construction Cost Estimates, $50 Million.
Metrolinx GO Transit and Rapid Transit Estimating and Cost Management from Program to
Project levels (over 400 projects), Toronto, Ontario; 2016-2017. Senior Program Estimator. Project
Scope: Road/Rail to Rails Grade Separation projects (12 Potential Sites, including Lakeshore East 3
Grade Separations), Lakeshore East Bridge (Former CN Bridges) Widening & Corridor Track
Expansion, Rouge Hill Station Improvement, Kitchener Highway 401 Tunnel, Union Station East and
West Track Enhancement, Lincolnville and Lewis Road Layover Facilities, Stouffville and Barrie
Double Track I & II, Port Credit Mobile Hub Complex Development, GO Transit Electrification, GO
Transit Enhance Train Control (CBTC), CTC Signalling projects, East Rail Maintenance Facilities, 50+
GO Transit Stations and Parkade Projects; $23 Billion+.
Baffinland Iron Mine Railway, Canada; 2012-2013. Senior Cost Estimator, Prepared Conceptual
Cost Estimate, Track and Signal, $50 Million.
Cote Nord Mining Railway, Canada; 2012-2013. Senior Cost Estimator, Prepared Conceptual Cost
Estimate, Track and Signal, $60 Million.
Northwest Light Rail Transit, Calgary, Ontario; 2012-2013. Senior Cost Estimator, Prepared
Construction Cost Estimate, Signal, Traction Power, Overhead Catenary Systems, Communication
Systems, $10 Million.
Union Station Rail Corridor Re-signalling, Toronto, Ontario; 2012-2013. Senior Cost Estimator,
Prepared Construction Cost Estimate, Track and Signal, $300 Million.
Canadian National Railway & Canadian Pacific Railway Signalling Capital Projects; 2012-2013.
Senior Cost Estimator, Prepared Construction Cost Estimate, Track and Signal, $1 – 50 Million.
Kitchener Waterloo Light Rail Transit, Toronto, Ontario; 2012-2013. Senior Cost Estimator,
Prepared Construction Cost Estimate, Conceptual Budget in Track and Signal, $50 Million.
O-Train Ottawa Expansion, Ottawa, Ontario; 2012-2013. Senior Cost Estimator, Prepared
Construction Cost Estimate, Conceptual Budget in Track and Signal, $10 Million.
Vancouver Evergreen Line, Vancouver, British Columbia, 2012-2013. Senior Cost Estimator,
Prepared Construction Cost Estimate, Conceptual Budget in Track and Power Rail, $30 Million.
Toronto Transit Commission Ashbridge Bay Street Car Maintenance Facility, Toronto, Ontario;
2012-2013. Senior Cost Estimator, Prepared Construction Cost Estimate, Track, Signal, Overhead
Catenary System, $50 Million.
Metrolinx Sheppard East Light Rail Transit Maintenance Facility, Toronto, Ontario; 2012-2013.
Senior Cost Estimator, Prepared Construction Cost Estimate, Track, Signal, Overhead Catenary
System, $50 Million.
Metrolinx GO Transit Erindale Parking Garage Design Build, Mississauga, Ontario; 2011-2012.
Estimator, $65 Million.
Metrolinx GO Transit Ajax Parking Garage and Station Improvement Design Build, Ajax, Ontario;
2011-2012. Estimator, $55 Million.
Metrolinx Exhibition GO Station Platform Improvement, Toronto, Ontario; 2011-2012. Estimator,
$10 Million.
Metrolinx West Toronto Diamond Rail to Rail Grade Separation, Toronto, Ontario; 2011-2012.
Estimator, $250 Million.
Metrolinx Weston Tunnel Phase III Rail to Road Grade Separation, Toronto, Ontario; 2011-2012.
Estimator, $190 Million.
Metrolinx Carlingview Rail to Road Grade Separation, Toronto, Ontario; 2011-2012. Estimator,
$45 Million.
Toronto Transit Commission Vaughan Metropolitan Centre, Vaughan, Ontario; 2011-2012.
Estimator, $230 Million.
Toronto Transit Commission Finch Ave West Station, Toronto, Ontario; 2011-2012. Estimator,
$120 Million.
Toronto Transit Commission Crosstown Light Rail Transit, West Launch Pit, Toronto, Ontario;
2011-2012. Estimator, $30 Million.
ESSROC New Terminal, Silo Construction, Toronto, Ontario; 2011-2012. Estimator, $20 Million.
RESIDENTIAL CONDOMINIUM
One Bloor Complex Development, Toronto, Ontario; 2010-2011. Senior Estimator, 70 stories, $250
Million.
Aurora Residential Subdivision, Toronto, Ontario; 2010-2011. Senior Estimator, 70 acres, $10
Million.
Triomphe I & II, Complex Development, Toronto, Ontario; 2002-2003. Project Administrator, 30+
stories, $200 Million.
Mondeo Springs, Condominium Development, Toronto, Ontario; 2002-2003. Project
Administrator, 14 stories, $60 Million.
Shermount, Condominium and Townhouses, Toronto, Ontario; 2002-2003. Project Administrator,
$80 Million.
WATER & WASTEWATER
Waterfront Toronto Portland Redevelopment and Marine Work, Toronto, Ontario; 2017.
Construction Management, Estimate and Cost Control, Cherry Street Landfill and Marine Work,
Bridges, Sewers & Watermain, Public Realm, etc. $1.4 Billion.
Tullamore Pumping Station & Reservoir, Toronto, Ontario; 2011-2012. Estimator, $30 Million.
Ripley’s Aquarium, Toronto, Ontario; 2011-2012. Estimator, $85 Million.
Skyway Waste Water Treatment Plant, Toronto, Ontario; 2011-2012. Estimator, $114 Million.
Lakeview Water Treatment Plant, Toronto, Ontario; 2011-2012. Estimator, $109 Million.
Mattagami Water Pollution Control Plant Upgrade to Secondary Treatment, Timmins, Ontario;
2012. Estimator, $62 Million.
INDUSTRIAL, COMMERCIAL & INSTITUTIONAL
Canada Bread Food Processing Plant, Hamilton, Ontario; 2010-2011. Senior Estimator, 400,000
sqft, LEED, $120 Million.
First Meadowvale Corporate Centre Phase I & II, 10 Stories, Toronto, Ontario; 2010-2011. Senior
Estimator, LEED, $80 Million.
Staples Fletcher Meadow, Toronto, Ontario; 2010-2011. Senior Estimator, $10 Million.
Halton Hills Design Build Industrial Development, Toronto, Ontario; 2010-2011. Senior Estimator,
450,000 sqft, $30 Million.
Metro Supermarket Prototype, Toronto, Ontario; 2010-2011. Senior Estimator, $10 Million.
Best Buy Prototype, Toronto, Ontario; 2010-2011. Senior Estimator, $10 Million.
333 King St. East 6 Stories Commercial Development, Toronto, Ontario; 2010-2011. Senior
Estimator, Prepared ICI Design Build Estimates, Conceptual Budget, Budget development, $80
Million.
Goldring Student Centre, Toronto, Ontario; 2011-2012. Estimator, $20 Million.
Elgin Mill Professional Centre, 4 stories, Richmond Hill, Ontario; 2008-2009. Senior Estimator, $8
Million.
Sunny Meadow Professional Centre, 4 stories, Brampton, Ontario; 2008-2009. Senior Estimator,
$8 Million.
Riverstone Golf & Country Club and related facilities, Brampton, Ontario; 2008-2009. Senior
Estimator, $12 Million.
LAND DEVELOPMENT, MUNICIPAL ROAD PAVING, SEWER & WATERMAIN
Over 200 projects, Ontario; 2004-2008. Senior Estimator, $1 – $12 Million.
POWER GENERATION AND NUCLEAR WASTE FACILITIES
Ontario Power Generation, Darlington Refurbishment Program, Ontario; 2014-2016. Prepared
Release Quality Estimate, Conceptual Budget to Detail Estimates. Project Scope: Staff Resources
Budget, Re-tube and Fuel Replacement, Fuel Handling, Turbine Generator, Steam Generator,
Shutdown Layup, Balance of Plant, Campus Plan, Project and Modification, $12.8 Billion+.
Ontario Power Generation, Deep Geologic Repository (DGR) for Low & Intermediate Level Waste
Program, and Adaptive Phased Management Program, Ontario; 2013-2014. Project Control
Consultant, Prepared Life Cycle Estimate, Development Conceptual Budget and Detail Estimate.
Project Scope: 150 project years lifecycle), including related waste management and processing
facilities, 600 m deep DGR, Mining / Blasting, Tunnelling, logistics and transportation design of used nuclear fuel cell bundles, and others, $30 Billion+.
Covanta Durham-York Waste to Energy, Incineration Facility, Darlington, Ontario; 2011. $110
Million.
SPORTS FACILITY
Pan-Am Game Stadia, Hamilton Soccer Stadium, York University Athletic Centre, Milton
Velodrome, Hamilton, Toronto & Milton, Ontario; 2011-2012. Estimator, $200 Million.
SITE REMEDIATION
Site Remediation, Pam-An Aquatic Centre, Toronto, Ontario; 2011-2012. Estimator, Design Build
Estimates, Conceptual Budget, Budget Development, $20 Million.